APTF VIZAG: MBNN -Phase-I Schools – School maintenance of all the assets .

MBNN -Phase-I Schools – School maintenance of all the assets .

డిసెంబర్ 21 నాటికి అన్ని ఫేజ్-1 పాఠశాలలు మన బడి నాడు నేడు లో ఇచ్చిన అన్ని కాంపోనెంట్స్ యొక్క repairs పూర్తి చేయాలని ప్రభుత్వ ఉత్తర్వులు.

Click Here To Download proceedings 

Government has decided that by 21st December all Phase-I Schools are to be given a facelift by taking up a comprehensive maintenance of all the assets created during Phase- I of Mana Badi Nadu Nedu programme.

Maintenance of assets provided by CPM Vendors:

All assets including painting within the warranty period will

be taken up by the companies. Head Masters has to raise

tickets for the repairs or maintenance of the assets. The

companies has to resolve the issues within 7 days from the

raising of tickets.

Maintenance of non-CPM assets:

School Maintenance Funds will be utilized by HMs to take

up maintenance of non-CPM assets.

Mana Badi Nadu Nedu 10 Components:

1. Toilets with Running Water:

There should be separate toilets for boys and girls.

Continuous water supply must be ensured at all hand-wash

stations. The following activities can be taken up with the SMF

funds.

i) Wall repairs (gaps and plastering)

ii) Flooring Repairs including tiles repair.

iii) Hand wash station

a) Replacement of taps

b) Replacement of Grating of out let for hand wash station.

iv) Sump and Over Head Tank repairs

a) Constructions of cast-in-situ water tank in a place damaged

pvc tanks

b) RCC tank leakages

c) Electrical motor repairs

v) Septic Tank repairs

vi) Doors and ventilators repairs

vii) Replacement of damaged doors and ventilators

viii) Roof slab repairs

ix) Others identifed as essential and needful.

No comments:

Post a Comment

Featured post

AP 10th class public exams result released today